Tuesday, June 2, 2009

Stup By Stup Build Buggy

dug drainage


Well, despite empty pockets, we decided to have at least prepare the bare essentials in the garden, the first is the drainage, that is, the connection of the rain water pipes a percolation.

The next trick still follows a path from the sidewalk to the front door so that the stroller can be placed in two months without getting wet in the house (at the time formed a large lake in the rain in front of the house). The Residual soil from the construction we can then distribute it to populate the land, all the rest (soil, patio, fence, etc.) must wait until fall or next year.

0 comments:

Post a Comment